Skip to content

Focus topic

HIL Testing Services

Test embedded control units against a simulated system before the real one is available, and turn the results into evidence a release decision can use.

Hardware-in-the-loop (HIL) testing connects real control electronics and software to a simulated environment. The scope can be a single test campaign on an existing bench, the test design for a new function, or continuing operation of a HIL test stream. Bench hardware, simulation models and access are agreed for the assignment.

A hardware-in-the-loop test loop

The control unit runs its real software while a simulator supplies the signals of the surrounding system. Highlighted steps are where test engineering work typically sits.

  1. Requirements and risksWhat must be shown
  2. Test casesStimuli, expected behaviour
  3. Real-time simulationPlant and environment models
  4. Unit under testControl electronics and software
  5. Measurement and evaluationSignals, network, faults
  6. Findings and evidenceLinked to requirements

Regression after each change

What the work covers

The agreed assignment determines which activities are included and where the responsibility boundary sits.

HIL test strategy and coverage

Decide which requirements and risks are verified at HIL level, which belong in software-in-the-loop or model-in-the-loop contexts, and what evidence each level must produce.

Test design and specification

Derive test cases from requirements and interface definitions, including fault conditions, timing behaviour and regression coverage for changed baselines.

Bench preparation and signal interfaces

Prepare the unit under test, its signal and network interfaces and the configuration of the test environment in coordination with the bench owner.

Execution and automation

Execute tests manually or through automated sequences, with identifiable software, hardware and bench configurations for every run.

Result analysis and reporting

Analyse deviations, separate product defects from environment or test issues, and report findings against the requirements they affect.

Typical starting points

  • A function cannot be tested on the vehicle or machine yet, but the control unit and software are available.

  • Defects are found late in system test and need to be reproduced under controlled, repeatable conditions.

  • An existing HIL bench has test cases, but coverage against requirements is unclear.

Example engineering outputs

Outputs are assignment-dependent and agreed for each engagement.

  • HIL test strategy and requirement-to-test coverage overview.

  • Test specifications and automated or manual test procedures.

  • Execution results with identified configurations.

  • Defect reports and verification summaries for release reviews.

Common questions

What is the difference between HIL, SIL and MIL testing?

Model-in-the-loop tests a function as a model, software-in-the-loop tests the compiled software without target hardware, and hardware-in-the-loop tests the real control unit connected to a simulated environment. Each level finds different defects, so the strategy assigns requirements to the level that can verify them.

Do you supply the HIL bench?

Test facilities are agreed for each assignment. Work can take place on an existing customer bench with its simulation models; who provides, operates and maintains the environment is settled during technical scoping.

Can HIL testing start before all requirements are final?

Yes. Test design can begin from the available requirements and interface definitions. Open points are recorded as coverage gaps so they stay visible until the baseline is complete.

Part of

Verification, Validation & Test

Verification strategy, test design and execution, linking requirements and risks to findings and release-relevant evidence.

Discuss a HIL test scope, coverage gap or bench workload.

Describe the current state, the interfaces involved and the result you need. Leave confidential technical files out of the first message.

Talk to us